It is very important for me as an operational manager to track production progress and costs. And in Kladana I can check production progress reports by finished products and by operations.
It shows all product items currently in production, along with the completed quantity, processing status, last completed stage, time in production, and the volume of work-in-progress.
Report by operations shows the workload of production areas as a percentage of the total production volume, as well as the load in hours based on the total standard hours from the product's Bill of Materials.